In order to prevent the roadway from continuing to deform, causing roadway damage or landslide accidents, paving the way for the re-activation of the mine, the Mine Roof Support is generally selected, and the Mine Roof Support is mainly used for the secondary Support Arch of the mine roadway and the mine roadway of the mountain tunnel. To increase the pressure resistance of the roadway section. In order to ensure safe construction, the following safety technical measures are formulated.
When replacing the used shed, you can flexibly choose the model, structure and shed distance of the Mine Roof Support, and strictly follow the relevant parameters to ensure that it works effectively, safely and reliably. Only when the Mine Roof Support is properly installed and used can it be accelerated. Roadway excavation speed, reduce the amount of backtracking in the roadway, ensure safe production, extend service life, and obtain better technical and economic benefits, so as to play the performance of Mine Roof Support.