(1) The support arch implements the construction site level management system, and various temporary construction facilities and living facilities are implemented in accordance with the approved construction organization design and general floor plan.
(2) The engineering materials and product components support arch are sorted into different categories and stacked in an orderly manner: the equipment and equipment are fixed and maintained, and the operation is kept tidy and the capacity is normal.
(3) The main roads in and out of the arch supported transport vehicles are regularly sprinkled and cleaned to reduce ground dust pollution caused by vehicle driving.
(4) There are eye-catching safety warning signs in the arch support construction area or dangerous area, set up safe passages, and organize special personnel to inspect regularly.
(5) The support arch construction site has reasonable entrances and exits, which are hardened with concrete, and entrances and exits are equipped with transportation vehicle flushing and drainage equipment that meets standards and specifications. Traffic instruction signs are set at the entrances and intersections of construction roads, and warning lights and lights are installed at night to ensure the safety of vehicles and pedestrians.
(6) Temporary drainage systems mainly consisting of drainage ditches, catchment tanks and sewage treatment plants are set up at the arch support construction site. Construction wastewater can be discharged to the municipal sewage treatment system after drainage ditch drainage, catchment pool sedimentation and treatment of sewage treatment plants .
(7) The support arch construction site insists on daily cleaning and daily cleaning. After construction, the construction waste is strictly prohibited.
(8) Arch support construction site personnel are listed and certified to work: construction personnel wear uniform work clothes.
(9) Strengthen the construction management of the arch support site to reduce the impact on the surrounding environment.
(10) Arrange the support arch site reasonably. All temporary facilities meet the required standards to ensure that the site is clean, the roads are smooth, the drainage is smooth, the signs are conspicuous, and the production environment meets standard operating requirements.