ban
CONTACT US
  • sales@chinacoalintl.com
  • +86-18660761375
  • No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Successful Case  /  Introduction To Installing The Mine Roof Support Sequence

Introduction To Installing The Mine Roof Support Sequence

Date:2019-01-18     Label:

Mine Roof Support

Roof Support

Support

First, the preparation of Mine Roof Support installation

1. Prepare the necessary tools for installing Mine Roof Support, such as pneumatic picks, pneumatic drills, electric drills, saws, shovel, etc., and carry the long-term tools to comply with relevant regulations.

2. Check that the Mine Roof Support installation has normal operating conditions in accordance with the requirements in the Safety Regulations.

Second, the installation sequence

This type of work should be carried out in the following order:

Safety Check → Repair Mine Roof Support → Clean up the site.

Introduction To Installing The Mine Roof Support Sequence

+

+

Please leave a message
skype
message