ban
CONTACT US
  • sales@chinacoalintl.com
  • +86-18660761375
  • No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /   Product Wiki
  • Steel Arch Support For Mining Equipment
    11-06 2019

    Steel Arch Support For Mining Equipment

    The steel arch support has the advantages of high initial support force, large supporting strength, easy installation and no deformation. Therefore, it is often used to manufacture roadway shrinkable

  • U Steel Arch Support
    11-05 2019

    U Steel Arch Support

    The U steel arch support is a steel with a cross-sectional shape like the English letter "U". The U steel arch support produced by different countries have different cross-sectional shapes, geometric

  • The Difference Between Steel Mine Supports And Steel Grid
    10-26 2019

    The Difference Between Steel Mine Supports And Steel Grid

    The steel mesh structure is a type of Steel Mine Supports and belongs to the same type of Steel Mine Supports. However, the difference between the steel mesh structure and the Steel Mine Supports is t

  • How Is The Transfer Of Tunnel Roof Support Operated?
    10-22 2019

    How Is The Transfer Of Tunnel Roof Support Operated?

    The main application area of Tunnel Roof Support is in the coal mining industry. Its product performance is directly related to the safety of the coal mining industry. How is the Tunnel Roof Support p

  • Prospects For Underground Roof Support
    10-19 2019

    Prospects For Underground Roof Support

    Underground Roof Support is primarily used for power plant steam pipes or boiler installations, heat displacement during operation and equipment installation. Based on the calculation of the force of

  • Mine Roof Support Spacing Settings Are Not Standardized
    10-16 2019

    Mine Roof Support Spacing Settings Are Not Standardized

    The irregularity of the Mine Roof Support spacing setting is a common problem in the installation process, as shown by the fact that the Mine Roof Support installation spacing is too large and the spa

+

+

Please leave a message
skype
message